This is another MTA exhaust ventilation fan plant construction site. This project, costing nearly $30 million dollars, involves the expansion of yet another preexisting fan plant to better remove smoke and increase air circulation within an MTA Subway tunnel.

DR-4951

DR-4953
New walls going into this gutted, ‘cut and cover’ room where ventilation equipment will be installed.

This project, as with the ‘Vent Plant #1’ listed on this site, has been froth with delays and neighbor displeasure with the sluggish pace of the project as well as, in this case, the erratic work schedule of construction crews. When the contractor dug up the street here, they came across 15 utility lines, 3 of which were unmapped, thus necessitating Con Ed to come in and work on weekends to figure out just what these power lines were and what they were connected to. Construction crews also were faced with a large chunk of unmarked bedrock which had to be chipped out of the way carefully, since blasting would have damaged both buildings along the site as well as the subway tunnel itself.

DR-4957

DR-4958
Vents under the sidewalk

DR-4962
Gangway from the subway tunnel vent space into the ventilation equipment room

Upon inspection, we found the site to be twice as large as Vent Plant #1. Inside this 50-70foot deep room (which again is built under an NYC Street), evidence of several rooms and chambers being built could be found, as well as utility and sewage lines high above (indeed, the whole area smelt mildly of a sewer), and finally towards the front, the original and very tiny MTA Fan chamber with the street above and subway tunnel below. This is the area you most commonly see as being under those gratings found on nearly every city street that the subways run under.

Curiously, at the rear of this large room is a brick wall directly under the street. What this wall was built for is not especially clear. Perhaps it was the rear wall of the original chamber, but it is suspected that the depth of this chamber has been increased at least 20-30 feet, and that this brick wall will simply be filled behind a newer concrete structure.

DR-4963

DR-4964
Into the new room, from the subway tunnel

DR-4968
Sewer and Con Ed pipes supported above – this is the underside of a large manhole.

Leave a Reply

Your email address will not be published. Required fields are marked *

  • About The Author

    Bad Guy Joe

    Bad Guy Joe
    Bad Guy Joe knows more about the NYC underground than anyone else on or below the surface of this planet. He has spent nearly 30 years sneaking into NYC's more forbidden locations. When not underground, he's probably bitching about politicians or building something digital. 
  • Recent Comments

  • Check out our Twitter feed

  • Social

  • Instagram Feed

  • Featured Press