Second Avenue Subway, 1970s Harlem Segment

Published on: October 29th, 2008 | Last updated: November 4, 2015 | Written by:

When we arrived at this tunnel, it had never been photographed before. Only a few daredevil graffiti artists even knew it existed, and everyone was tight lipped about how to get in. Make no mistake – getting in was a challenge, but we don’t do this because it’s always easy.

History
This tunnel is one of two sections of the Second Avenue Subway built in the 1970s. It runs 10 blocks under Harlem. It is suppose to be included in Phase 2 of the second avenue subway project (the first phase, from 63rd to 96th streets, is supposed to open in 2016). The end of Phase 2 is suppose to be 125 street, so this portion of tunnel is hugely significant – and should mean that phase 2 is built quickly. Of course, I somehow doubt that will happen. It’s impossible to follow NYC’s infrastructure projects and not be very skeptical of when, or even if, they will be completed.

All of that said, here’s a quick look at this tunnel.

IMG_5683

IMG_5686

IMG_5694

IMG_5699

IMG_5708

IMG_5716

IMG_5718

IMG_5730

IMG_5746

IMG_5747

IMG_5756

IMG_5764

IMG_5769

Sign up for our weekly newsletter.

Comments

NOTE: It sometimes takes a short while for comments to be approved - unfortunately there's a lot of spam comments that come in. I absolutely love when y'all share personal stories of friends relatives etc who worked in these places. It really helps capture what these places were like before they closed up shop.

If you're feeling salty, argumentative comments completely devoid of facts (supply links to support your argument) will not be published. Got a case to state? come with the details.

4 responses to “Second Avenue Subway, 1970s Harlem Segment”

  1. Union Tpke says:

    Hi, thanks for the pictures. Apparently, the MTA as part of Phase 2 will be destroying the whole section and wasting money. http://web.mta.info/capital/sas_pdf/Community%20Board%2011%20Presentation%204.5.16%20Final.pdf

    I think that you would agree that they should just use the existing segment and have a center island platform.

  2. Chris says:

    Sadly, there may be good logic in destroying the whole section and rebuilding. The MTA has committed to making all new stations ADA compliant, and wants to install air conditioning (if possible, as I understand things) as part of the design. Segments built in the 1970’s did not have these requirements, and likely can not be used. Interstaton segments may not be deep (or shallow) enough to connect with the line now in use. So, we must ask why the segments can’t be used as is before destroying them.

  3. George says:

    The existing tunnel will only be unused as is and demolished through the 106 Street station area. That was built with a middle siding only as provision between the mains 1 and 2 and not originally intended to be a station site.

    As designed in the 1960’s, the Phase 2 segment to be reused was only to have a middle siding after departing an Uptown station site (I’m guessing that was the present 96th Street), then after that a station a stop at 116th Street, then ultimately head north toward the Bronx. The actual stations projected for south of and north of the short piece that was built through East Harlem were never begun. The terminal at 125 & Lexington represents a major (post-2001) revision to the route as originally projected. In time it would appear to preclude the long-projected extension of this line into the Bronx, as was anticipated since its 1920’s conception.

    When the Second Avenue Subway misfired in the 1970’s, the city and world were a lot different. There wasn’t a lot of planning energy expended on its passage through East Harlem, which was then in sharp decline, and a minimum of concern about construction impacts on urban life as there is now. That, I would proffer, is why that particular segment was actually built early on. By 2020, the streetscape above this zone will be almost completely changed and transformed socially!

  4. Awaken says:

    RE the tunnel being destroyed: word on the street currently is that the tunnel from 110th St to 116th St will be used, and 116th St through 120th St will be heavily renovated and partially reconstructed. The MTA’s budgetary constraints for the last 5 years since Phase I opened combined with the pandemic certainly have pushed Phase II back, but supposedly it’s still in the works, should the money come in.

    This tunnel is actively inspected and maintained–albeit in a limited sense–by transit. It is now lit up by strings of the new NYCT LEDs, and the columns are painted regularly. The pumps and some drains are also maintained. It does often get more flooded than is visible in these photos–the last time I was there, large sections of the roadbed were over an inch deep with muck water.

    Back in 2019, some graf writers from Europe were taken down there and they put up some (IMO) pretty shitty tags on every single wall. The walls had been mostly blank, nearly untouched since Bad Guy Joe took these shots. Transit buffed all of it within a couple months.

    Mad respect to LTV as always for paving the way for the younger generations. I would not know any of this had I not been shown this website years ago.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

  • About The Author

    Bad Guy Joe

    Bad Guy Joe
    Bad Guy Joe knows more about the NYC underground than anyone else on or below the surface of this planet. He has spent nearly 30 years sneaking into NYC's more forbidden locations. When not underground, he's probably bitching about politicians or building something digital. 
  • Recent Comments

  • Newsletter: All Things Exploring

    Sign up for our weekly newsletter.
  • What is…

    LTVSquad.com is the blog of NYC's most notorious team of explorers. We bring you a unique roasted blend of content culled from the fringes and dark underbelly of this fine city. Consider us an Autodidact's guide to urban exploration, adventure and fringe art. Mixed with 2 part photography and video, 1 parts social commentary and (ill)legal mentality.

    All text and original photographs are copyrighted material. LTV Squad is fully staffed by a team of lawyers and we absolutely love to get our litigation on.

    Inquiries, private comments, etc: Contact Control{@}ltvsquad.com.

  • Calendar Ov Posts

    October 2008
    S M T W T F S
     1234
    567891011
    12131415161718
    19202122232425
    262728293031  
  • -->